LM6000 Peak Performance

icon-upgrades-tool

Upgrade Tools

Sign in to view saved upgrades or request a formal quote from your GE Account Manager.

View Saved Upgrades >

test-icon-3

Asset Evaluator

Identify opportunities to improve your GE gas turbine's performance with our Asset Evaluator.  ASSET EVALUATOR 

The Peak Performance Upgrade enables the LM60000PC to achieve up to 5% additional output over current nominal power through peak firing. This capability is available within the T2 range of 45F to 85F. OEM controls system and S7 fuel core software are required.

Applicable Turbine Models

LM6000

Please contact your GE Sales Representative or Customer Service Manager for more details.

  • Increase Power Output