Save time, reduce costs, and improve safety with GE’s rotor-in major inspection. Specialized tooling and techniques allow major inspections to be performed without removing the turbine’s rotor.

Want to Learn More? 

Total Solutions for Your Total Plant

We offer total plant capabilities to services both GE and cross-fleet power generation equipment for utility and industrial plant operators worldwide.

Learn More  

Multi-year Agreements

Discover ways to partner with GE for long-term value and optimization of your power plant.

Learn More  

B-/E-Class Major Inspections Without Rotor Removal

  • Save time by decreasing outage duration up to seven days.
  • Cut costs by eliminating the crane, platform, and trucks required for loading and unloading parts, and the scaffolding needed for accessing bolted flanges.
  • Reduce labor and reworks caused during dismantling and installation.
  • Reduce EHS risk with less exposure opportunities through reduced crane moves, lifting, and footprint requirements.
  • Simplify logistics by requiring fewer interfaces with other contractors, and a smaller footprint to store parts.

F-Class Major Inspections Without Rotor Removal

Improved Safety

  • Reduced EHS risk with less exposure opportunities through reduced crane moves, lifting, and footprint requirements
  • Reduced liklihood of damage to the compressor or stator vanes

High Quality

  • All compressor and turbine sections are inspected
  • All lower half stator vanes will be cleaned and throughly inspected
  • Rotor can be rotated 360 degress for maintenance

Outage Reduction

  • Outage durations can be reduced up to 20%
  • No downtime during the rotation of cranes
  • Generator alignment can begin sooner