Want to Learn More? 

HRSG & Boiler Tube Cleaning

Pressure waves penetrate deep into the tube bundle for a more effective cleaning that can be done in half the time.

Learn More  

Total Solutions for Your Total Plant

We offer total plant capabilities to services both GE and cross-fleet power generation equipment for utility and industrial plant operators worldwide.

Learn More  

Desuperheater Redesign and Replacement

In cases of cyclic operation, desuperheaters are often the cause of reliability issues. Using our design expertise and OEM experience, GE can determine the root cause of the problem and propose an improved system. The solution may include repair, replacement with a different design, piping design changes, or operation concept improvements.

Benefits

  • Up to 60% reduction in thermal stresses
  • Superior design for startup and transient operation
  • Large, separate manifolds to prevent flooding of lower header

Comprehensive Performance Improvements to increase flexibility, reliability, and availability

GE offers evaluations, parts and labor for performance enhancing modifications to piping and pressure parts.

  • Material upgrades 
  • Header or Harp Assembly enhancements for improved flexibility
  • Piping system modifications for improved access and flexibility
  • Improved drainage
  • Elimination of water hammer