Type 2 and 3 Lifetime Extension

A customized GE parts and services package can extend the lifetime of Jenbacher Type 2 and 3 engines running on natural gas or treated biogas by up to 25 percent or 75,000 operating hours (oph).

  • Lifetime & Services Interval Extension

What can this upgrade do for you?

  • Enhanced flexibility.
    Allows customers to react quickly in response to changing gas prices, feed-in tariffs, and emission regulations.
  • Prolonged engine lifetime.
    With more than 35,000 reciprocating engines with a 147 GW capacity deployed in more than 170 countries, GE has well-proven global technology experience that makes it possible to prolong the life of Jenbacher Types 2 and 3 engines by up to 25 percent.
  • Service agreements option.
    GE offers a special maintenance agreement covering the Lifetime Extension period.
  • Insurability due to OEM support.
    Based on the program’s OEM support, most insurance companies will consider prolonging existing contracts.

 

NEXT STEPS

Request a quote

 
 

Spare Parts

Need parts for your next service interval?

VIEW SPARE PARTS PACKAGES

type2_3_life_extension

HOW WE GET YOU THERE

The Lifetime Extension package applied at 60,000 oph and executed onsite includes:

  • Mandatory upfront inspection, including basic analytics performed by an authorized technical expert.
  • Lifetime Extension core overhaul package of predefined core parts (e.g., pistons, connecting rod bearings, vibration damper) and onsite services.
  • Optional parts and services package(s), if recommended after upfront inspection and analytics.
  • Optional follow-up inspections and continuous analytics to monitor the engine’s condition.
  • OEM maintenance documentation update.

Program Conditions:

  • Gas engine operated on natural gas or treated biogas in accordance with GE’s fuel specification TI 1000-0300.
  • Upfront inspection confirms engine suitability for an onsite repair.
  • Standard warranty on replaced parts and services.
  • Package cannot be combined with output and efficiency upgrade programs.
  • Does not include inspection or overhaul of auxiliaries or other equipment beyond genset scope.
  • Expected downtime for the Lifetime Extension overhaul is 7 to 10 working days.

 

Applicability

Upgrade applicable for Type 2 and Type 3 C-Version running on natural gas or treated biogas.

NEXT STEPS

Request a quote

 
 

Spare Parts

Need parts for your next service interval?

VIEW SPARE PARTS PACKAGES